Monday, April 18, 2016

Week 5

The rust issue was finally fixed, production was back to normal. There are now two hydration tanks which facilitated the production. Nikhil and I are back to the regular auditing and quality measuring. This time the parts we had to deal with were medical equipment (part of a catheter), some of the parts were found to have distortions and flashes which made them unusable.